24/01112/FUL
|
The construction of and operation of a Battery Energy Storage System of circa 100 megawatts electrical output with a total capacity of circa 200 megawatt hours, associated site access and partial cable route, with associated work As shown on drawing no's: EDG113-GC-DD-02 REV1-230713; EDG113-GA-DE-07 REV1-231220; EDG113-GA-DE-02 REV3-20240508; EDG113-GA-DE-03 REV1-230712; EDG113-GC-DD-03 REV1-230713; EDG113-GA-DE-04 REV1-230712; EDG113-GA-DE-05 REV1-231024; EDG113-GA-DE-06 REV1-231220; EDG113-GA-PP-02 REV3-20240829; EDG113-GA-SL-01 REV8-20240829 received 12.09.2024 and EDG001-PL-02 REV 03 and EDG001-PL-01 REV 03 received 02.06.2025
|
Land To North East Of Eco Park Charlton Lane Shepperton TW17 8QA
You can select up to 25 documents to download in one archive file at a time.

